
Manage tasks Chapter 1
2. Enter task information in the New Task dialog box.
Topic Description
Name Type a name for the task.
Description Type an optional description for the task.
Type
Choose Event for the task type.
Trigger Choose a trigger for the task.
Tag Choose a tag if the field is active for the selected trigger.
Execute Task If No Event Occurs Within Select the check box and type a time period that must elapse
before a task can run.
Priority Enter the task priority value.
Watchdog Type the watchdog time for the task.
3. Click OK.
Create a periodic task
A periodic task performs a function or functions at a specific rate.
Important:
Be sure that the time period is longer than the sum of the run times of all the programs assigned to the task.
• If the controller detects that a periodic task trigger occurs for a task that is already operating, a minor
fault occurs (overlap).
• Priorities and run times of other tasks may also cause an overlap.
Rockwell Automation Publication 1756-PM005-EN-P - October 2014 27
Kommentare zu diesen Handbüchern