Rockwell-automation AADvance Controller System Build Bedienungsanleitung Seite 74

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 130
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 73
3-30
Document: 553632
(ICSTT-RM448_EN_P) Issue: 08:
System Build Manual (AADvance Controller)
Secure the socket assembly by inserting the two M3 socket cap screws.
Tighten the screws with a 2.5mm Allen key.
Install the cable to the socket assembly and tighten the retaining screws by
hand.
2) Insert the free end of the expansion cable into a right hand socket of a T9300 I/O
base unit.
Insert a cable plug assembly into into the right hand socket of the processor or
I/O base unit.
Secure the plug assembly by inserting the two M3 socket cap screws.
Tighten the screws with a 2.5mm Allen key.
Install the cable to the plug assembly and tighten the retaining screws by hand.
Connect Between a T9300 I/O
Connect Between a T9300 I/OConnect Between a T9300 I/O
Connect Between a T9300 I/O
Base Unit and a T9300 I/O Base Unit
Base Unit and a T9300 I/O Base UnitBase Unit and a T9300 I/O Base Unit
Base Unit and a T9300 I/O Base Unit
1) Connect the expansion cable between a T9100 processor base unit (or a T9300
I/O Base unit) to a T9300 I/O base unit.
Insert a cable plug assembly into into the right hand socket of the processor or
I/O base unit.
Secure the plug assembly by inserting the two M3 socket cap screws.
Seitenansicht 73
1 2 ... 69 70 71 72 73 74 75 76 77 78 79 ... 129 130

Kommentare zu diesen Handbüchern

Keine Kommentare