FACTORYTALK SCHEDULER USER’S GUIDE
108
• • • • •
SSD B
LUE
F
INISHED
F
RAME
SHP F
RAME
Seq
#
Operation
Work Cell
Setup
Time
Process
Time
Additional
Resources
Notes
10 Finish SSD
Blue Frame
Finish 0.11 0.155 SSD Frame
required
20 Assemble
SSD Blue
Frame
Subassembly 0.19 0.083 Labor (1) Place in
inventory
10
Finish SSD
Blue Frame
20
Assembly
SSD Blue
Frame
Seq
#
Operation
Work Cell
Setup
Time
Process
Time
Additional
Resources
Notes
10 Cut SHP Frame
Tubing
Cut 0.36 0.12
20 Bend SHP Frame
Tubing
Bend BM 0.154
30 Machine SHP
Frame Tubing
Machine MM 0.211
40 Weld SHP Frame Weld WD 0.234 Place in inventory
10
Cut SHP
Frame Tubing
20
Bend SHP
Frame Tubing
30
Machine SHP
Frame Tubing
40
Weld SHP
Frame